ProSYS Attack Enclosure for UL Model: ProSYS B23UL Installation Guide ȱ
2 Mounting the Attack Enclosure To mount the attack enclosure, follow this procedure: 1. Remove all the metal knockouts from the cabinet. 2. Plug
3 Fig.2 Knockouts disc plug Fig.3 Implementation of cabinet attack resistance
4 Installing ProSYS Accessories inside the Attack Enclosure Box B23UL Installation Modules Mapping
5 Accessories on the Right Side 2A GSM Module1 J14=OFF(1 pin)J13=ONJ15=NRBABProSYSTelephone connectionATelephone LineATelephone SetProSYSBUS conne
6 Accessories on the Top Side 34 Connection Holes Optional Modules Model Name ProSYS 8 Zones ProSYS EZ8 ProSYS 8 Zones G3 ProSYS EZ8G3 ProSYS
7 Accessories on the Left Side 56 Connection Holes Optional Modules Model Name ProSYS 8 Zones ProSYS EZ8 ProSYS 8 Zones G3 ProSYS EZ8G3 ProSYS
RISCO Group Limited Warranty RISCO Group and its subsidiaries and affiliates ("Seller") warrants its products to be free from defects in ma
Comments to this Manuals